Friday, June 3, 2011

Progress Photos 6/3/11





Showers have been Installed in 1st Floor Restroom






Insulation Install on Basement Ceiling






Tacoma Power Prepping for Transformer Delivery





Work Continuing on the Roof





Plumbing Rough In at 2nd Floor Bathroom






Window Pan and Flashing Install East Elevation






Installing Storefront Frames






Framing at 1st Floor Multi Use Room






The Basement has been Closed and the Ramp is being Prepped for Paving