Progress Photos 6/17/11

Panel Install DCR Room





Insulating Duct after Mechanical Inspection





Connect 1st floor Duct to Main Shaft





Sprinkler Room Pipe Install





2nd Floor Sheet Rock Install





Elevator Cab Being Built





Stucco Prep Work Being Completed Around Entire Building