Progress Photos 6/17/11
Panel Install DCR Room
Insulating Duct after Mechanical Inspection
Connect 1st floor Duct to Main Shaft
Sprinkler Room Pipe Install
2nd Floor Sheet Rock Install
Elevator Cab Being Built
Stucco Prep Work Being Completed Around Entire Building