Friday, June 24, 2011

Progress Photos 6/24/11

Stucco Assault!





Stucco Color at Main Entrance





Stucco Color At Garage





Panel Make up on 1st Floor





Operable Partition Support Beam





Ceiling Grid & HVAC Install in Main Lobby





Elevator Door Install





Elevator Control Units in Basement


Friday, June 17, 2011

Progress Photos 6/17/11

Panel Install DCR Room





Insulating Duct after Mechanical Inspection





Connect 1st floor Duct to Main Shaft





Sprinkler Room Pipe Install





2nd Floor Sheet Rock Install





Elevator Cab Being Built





Stucco Prep Work Being Completed Around Entire Building

Friday, June 10, 2011

Progress Photos 6/10/11





Main Air Duct Install 2nd Floor





Working on the DCR Room





Exterior Wall Insulation 2nd Floor





Raised Dias Framing





Waterproofing & Stucco Prep North Elevation






VAV Delivery





Tacoma Power Hooking Up Transformer





Skylight Framing 2nd Floor






All Windows Have Been Installed





Setting Air Handler Units on Roof


Friday, June 3, 2011

Progress Photos 6/3/11





Showers have been Installed in 1st Floor Restroom






Insulation Install on Basement Ceiling






Tacoma Power Prepping for Transformer Delivery





Work Continuing on the Roof





Plumbing Rough In at 2nd Floor Bathroom






Window Pan and Flashing Install East Elevation






Installing Storefront Frames






Framing at 1st Floor Multi Use Room






The Basement has been Closed and the Ramp is being Prepped for Paving