Showers have been Installed in 1st Floor Restroom

Insulation Install on Basement Ceiling

Tacoma Power Prepping for Transformer Delivery

Work Continuing on the Roof

Plumbing Rough In at 2nd Floor Bathroom

Window Pan and Flashing Install East Elevation

Installing Storefront Frames
Framing at 1st Floor Multi Use Room

The Basement has been Closed and the Ramp is being Prepped for Paving