2413 Pacific Avenue/Foremost
Friday, July 22, 2011
Progress Photos 7/22/11
Lobby Planter
Blind Install 2nd Floor
Sinage and Security 2nd Floor
Dirtt Wall in Main Lobby
Milk Bottle Lights
Finished Hallway
Bathroom Counters and Sinks
Judicial Benches
Completed Neon Sign
Pouring New Sidewalk
Neon Sign at Night
Friday, July 15, 2011
Progress Photos 7/15/11
Installing the Neon Sign
Canopy Glass is Completed
Restroom Counter Install
Restroom Tile
Reception Room
Break Room Cabinets
Garage Screens
Restroom Accessory Install
Friday, July 8, 2011
Progress Photos 7/8/11
Prepairing for Terrazzo in Main Lobby
1st Floor Multipurpose Room
Janitor Closet
Fire Alarm Control Units
Exit Hallway 1st Floor
Storefont at North Entrance
Framing Art Niches 1st Floor
Door Install & Paint 2nd Floor
Friday, July 1, 2011
Progress Photos 7/1/11
Gas Service Completed
Storefront Glazing Install
Ceiling Grid is Ready for Panels in Garage
Roll Up Garage Door Completed
Main Entrance View
View of Pacific and 25th Ave
View of South Elevation
Friday, June 24, 2011
Progress Photos 6/24/11
Stucco Assault!
Stucco Color at Main Entrance
Stucco Color At Garage
Panel Make up on 1st Floor
Operable Partition Support Beam
Ceiling Grid & HVAC Install in Main Lobby
Elevator Door Install
Elevator Control Units in Basement
Friday, June 17, 2011
Progress Photos 6/17/11
Panel Install DCR Room
Insulating Duct after Mechanical Inspection
Connect 1st floor Duct to Main Shaft
Sprinkler Room Pipe Install
2nd Floor Sheet Rock Install
Elevator Cab Being Built
Stucco Prep Work Being Completed Around Entire Building
Friday, June 10, 2011
Progress Photos 6/10/11
Main Air Duct Install 2nd Floor
Working on the DCR Room
Exterior Wall Insulation 2nd Floor
Raised Dias Framing
Waterproofing & Stucco Prep North Elevation
VAV Delivery
Tacoma Power Hooking Up Transformer
Skylight Framing 2nd Floor
All Windows Have Been Installed
Setting Air Handler Units on Roof