2413 Pacific Avenue/Foremost
Monday, April 25, 2011
Progress Photos (4-25-11)
Window Openings at West Exterior
2nd Floor Metal Decking
2nd Floor Metal Decking
Exterior Scaffolding
2nd Floor Metal Decking (From Below)
RediStairs (Stair A)
Steel Connection to Existing Building
Exterior View (Looking North)
Friday, April 15, 2011
Progress Photos (4-15-11)
Steel Installation (Looking South)
Steel Installation (Looking West)
2nd Floor Window Openings
2nd Floor Metal Decking
Stair A Installation